FLEECE LINE SUSPENSION

By KAIA

Fleece Line is a modern linear pendant lighting that captures the refined properties of our Golden Fleece chandelier in a single-line suspended pendant. Hand-crafted brass elements rendered in minimalist form make this pendant an example of KAIA’s philosophy: to create objects of harmony embodied by simplicity.

Designed by Markus Benesch Creates
Handmade by KAIA

 

DOWNLOADS

PRODUCT SPECIFICATIONS

Dimensions:

1400 mm x 35 mm x 70 mm (55.11 in x 1.38 in x 2.75 in)

Weight:

2 kg (4.4 lb)

Certification:

IP20 CE

MATERIALS & FINISHES

FLEECE LINE SUSPENSION is made from Solid brass and available in the following finishes:

190 02 202 - Brushed brass

This product can be offered with dim to warm technology on request. Please contact sales@kaialighting.com

DELIVERY & RETURNS

For ‘off-the-shelf’ Goods purchased through Our Site, the Goods will normally be delivered within one – four weeks after the date of payment receipt unless otherwise agreed or specified during the ordering process.

For ‘customised line’ Goods purchased through Our Site, the Goods will normally be delivered within eight – fourteen weeks after the date of payment receipt unless otherwise agreed or specified during the ordering process.

For more information, please refer to our trade B2B and retail B2C Terms and Conditions.

MOUNTING INSTRUCTIONS

Before commencing installation ensure the relevant mains supply has been safely isolated/disconnected. Installation shall be carried out by a qualified electrician only. Ensure all electrical connections are tight with no loose strands, including factory made connections. The mains power must only be switched on once the fitting has been electrically connected to the driver.

Before installation it needs to be guaranteed that the existing ceiling/wall construction is suitable for the weight of the installed chandelier.

1. Unscrew the main body from the threaded mounting block and mount on the ceiling.
2. Secure the threaded mounting block in place with the screw provided.
3. Pull the brass cable coating by 3-5 cm and cut off the plastic cover.
4. Push the brass cable coating back to position.
5. Pass through wire rope firmly into the main body until it locks in place.
6. Screw wire rope into the rope fixing.

CARE INSTRUCTIONS & PATINATION